When Do You Need a Permit?
The short answer: if your project changes the structure, size or use of a building, expect to deal with Toronto building permits. If you are unsure, call us. We will give you a straight answer.
Required. You will usually need a building permit for a new home, an addition, a second storey, a new garage, or a lane or garden suite. You also need one to remove structural walls, add or enlarge windows and doors, or turn a basement into a separate unit. Picture a Scarborough family adding a bedroom above the garage. The permit comes before the first nail.
Not required. Cosmetic updates usually do not need one. Think painting, new flooring, or replacing cabinets and counters in the same layout. Picture a Mississauga homeowner swapping kitchen cabinets. Rules vary by city and project, so check first.
Separate permits. Some Toronto building permits come with extra approvals, such as demolition, work near a ravine or conservation area, or tree protection. Some lots also need a minor variance because the design does not meet the zoning by-law. Picture a North York owner planning a larger rear addition. A variance hearing may come first. We flag these items at the start, so nothing surprises you later.